Example website Lapline Siding Co. is not a real company. This page shows Tailgate Office’s NapkinPrice widget running on a contractor’s own site, quoting against real rates in a real account. Missed-call text-back Open the demo dashboard About NapkinPrice
Lapline Siding Co.Fredericksburg, VA · siding, soffit and trim since 2009 (301) 555-0142
Siding, soffit and trim · Fredericksburg and the I-95 corridor

The last time this wall gets touched. Priced before we take it off.

Pace the walls, count the windows, tell us what is on the house now. You get a real price range in about a minute — not a per-square-foot teaser that leaves out the trim wrap, the soffit and the dumpster. Then we measure, and we put it in writing before a single course comes down.

Weather barrier on every wall Class A licensed and insured Rot shown to you before it is covered
Instant price range
We wrap every openingCoil bent on the brake to fit your sill and your jamb, not a strip of J-channel and a shrug.
You see the sheathingRotten board gets a photo and a number before anything goes back over it.
Soffit and fascia togetherDoing the wall and leaving the roof edge is half a job that looks like half a job.
Siding is all we doNo roofs, no decks. The crew that shows up has hung board all week.
What we do

Pick the board first. The rest of the questions follow from it.

Vinyl and fiber cement are not two prices for one job, they are two jobs. One hangs loose on a nail hem so it can move; the other is blind-nailed tight, cut with a dust saw and placed by two people. So they are two separate forms on this page, each with its own rate, rather than one form with an upgrade fee that would mean nothing on a wall we have not measured.

Priced on this page

Vinyl and insulated vinyl siding

The volume job around here, and what most of these subdivisions want back. Standard lap, premium lap, shake or board-and-batten on the gables, or foam-backed insulated — all off one rate of $4.40 a square foot of wall.

Priced on this page

Fiber cement, engineered wood and cedar

Heavier board, longer life, a different crew day, and its own base rate of $8.60 a square foot. Engineered wood, fiber cement primed or factory-finished, shingle panel, or cedar stained on site.

In every number

Trim wrap, soffit and fascia

Every window and door wrapped in bent coil, vented soffit, wrapped fascia and the frieze where the wall meets the roof. Asked about explicitly on both forms, because a per-square-foot headline never includes them.

In every number

Tear-off and the dumpster

One layer or two, vinyl, aluminium or nailed clapboard. The dumpster goes on the driveway, the tip fee is ours, and a magnet goes over the grass before we leave.

Shown, never assumed

Sheathing and rot

Nobody can see behind your siding, including us. We only price the damage you already know about; anything we find gets photographed, priced by the sheet and agreed by you before it is covered.

Site visit

Stucco, stone, storm damage and asbestos shingle

Stucco and EIFS, stone veneer, a storm claim, and the hard grey shingle on pre-1980 houses that is usually asbestos cement. We come and look at those rather than quote them off a form.

How we price

A number before the wall comes off, not after

The form at the top of this page uses our real rates. It shows a range rather than a single number because the corner count, the state of the sheathing and how square the openings are were built are things we can only settle standing at the wall with a tape.

Pick the board, then the wall

Which material, how many square feet, how tall, how many openings to wrap, how much soffit and fascia, and what is coming off. The same questions we ask on the phone, answered in a minute.

See the range

Midpoint plus or minus 10% on vinyl, 12% on the heavier board, which has more under it that we cannot see. Jobs under our $3,500 minimum quote at the minimum. Anything over $32,000 gets a measure instead of a number.

We measure and confirm

Free measure, exact price, written warranty. Travel is priced from your ZIP. Nothing here moves with the calendar: a re-clad costs the same in March as in September, and we would rather talk you out of January than sell you a discount for it — vinyl splits at the nail hem in the cold and site-applied paint will not cure below 50 degrees.

Service area

Based in Fredericksburg. We say what the trip costs before we make it.

Your ZIP code sets the travel line on your estimate. A siding crew is a trailer, a brake and four people for a week, so a job up the corridor is four commutes on I-95 and not one. No surprises on the invoice, and no free drives built into everybody else’s price.

  • Local: Fredericksburg, Spotsylvania, Caroline and King GeorgeZIPs 224xx
    No travel fee
  • Stafford and QuanticoZIPs 225xx
    +$95
  • Prince William, Fairfax, Arlington and AlexandriaZIPs 220xx, 221xx and 222xx
    +$180
  • Everywhere else we travelAny other ZIP we can reach
    +$320 and +5%
Notes for anyone evaluating the demo
  • Priced path. Pick Vinyl and insulated vinyl siding, then: 2000 square feet of wall, standard vinyl lap, two stories, 18 openings to wrap, 165 feet of soffit and fascia, one layer of vinyl coming off, haul it away Yes, nothing known behind it, average number of cuts, no lift. Use ZIP 22401. The live pricing engine returns $15,271 – $18,664 with the disclaimer, and the lead lands in the demo account’s inbox. 2,000 feet at $4.40, 18 openings at $72 and 165 feet at $15 make $13,256 of dollars once the $685 dumpster is in; the three percentage answers — two stories +14%, pulling one layer of vinyl +6%, average cuts +8% — pool to +28% and apply once to all of it. That midpoint, $16,968, is $8.48 a square foot of wall all in.
  • Why there are two priced services and not one, which is this trade’s whole engine story. No rule kind multiplies one question’s answer by another’s, so “the material sets the per-square-foot rate” cannot be expressed. The rejected alternative was one service with the material as a percentage: standard vinyl to cedar shake is 2.89× on the wall line, which is +189% — a number that reads as a typo on a homeowner’s screen, and one a pooled percent would also apply to the dumpster fee and the soffit run. A flat dollar upgrade was rejected outright, because a flat adder is added once per job and would charge a 900-foot rancher and a 3,200-foot colonial the same to switch board. So each family gets its own service and its own base rate, and the material dropdown inside a family only carries the spread within it. Run the same house through both: Fiber cement, engineered wood and cedar at 2000 feet in prefinished engineered wood comes back $25,830 – $32,874, and in factory-finished fiber cement $30,102 – $38,312.
  • Percentages pool, they do not compound. On the priced path +14, +6 and +8 add to +28%, not to a 1.14 × 1.06 × 1.08 that would land about 2% higher. It is the version a homeowner can follow on the phone, which is why the engine does it that way.
  • Where the pooling is a compromise, said out loud. A pooled percentage lands on the whole additive figure, so the +14% two-story band is applied to the trim wrap, the soffit run and the dumpster as well as to the wall. On the priced path that is about $624 of the $16,968 midpoint. The height question’s help text says it is “figured across the job” rather than implying it only touches the wall, and the measure is where it is trued up.
  • The per-unit rates are the only things that multiply. Wall square feet, openings and feet of soffit and fascia are multiply rules; everything else is a percentage or a once-per-job fee. Answer 0 to the openings and 0 to the soffit run and the same 2,000-foot wall falls to $10,927 – $13,355 — the $4,827 between the two midpoints is hand work at the edges that a per-square-foot headline rate never quotes.
  • The material is the biggest lever inside a family too. The same priced path in foam-backed insulated vinyl instead of standard lap: $18,850 – $23,039, because the pool goes from +28% to +58%. In the heavier board, the 1,250 sq ft Cape at $16,407 – $20,882 in factory-finished fiber cement is $19,740 – $25,123 in cedar stained on site.
  • The question that deliberately charges nothing. “What do you expect us to find behind it?” carries 0% for No idea — it has never been off, and the priced path is identical whether you answer that or Nothing we know of: $15,271 – $18,664 either way. Only damage the homeowner already knows about is priced — Known water damage takes the same job to $17,180 – $20,998. Charging online for a guess about a wall nobody has seen would have been the easiest percentage in the file to justify and the least honest.
  • A rule that raises the floor rather than adding dollars. 700 square feet, two stories, 6 openings, 60 feet of soffit, one layer off, hauled away, and Yes to the wall we cannot reach from a ladder: the work itself is $6,116, but the minimum rule lifts the floor to $9,500 and the quote comes back $9,500 – $10,450. The same wall answered No quotes $5,505 – $6,728. A boom lift is delivered, rented by the day and collected whatever the wall turns out to be worth, which is a threshold and not a rate — and this is the rule kind that says so. The heavier board carries the same rule at a higher floor, $13,000.
  • Travel zone. Repeat the priced path with ZIP 22554 (Stafford) for the near fee: $15,356 – $18,769. With 22191 (Woodbridge) for the corridor ring: $15,433 – $18,862. Any ZIP outside the listed prefixes, whether 20120 (Centreville, VA) or 75001 (Texas), falls to the catch-all zone: $16,322 – $19,950, the percentage first and then the flat fee.
  • Out of area. Use ZIP 99901. The visitor gets a polite decline instead of a price, and the lead is still captured.
  • Minimum floor. 200 square feet on one gable end, standard vinyl, one story, no openings, no soffit, nothing coming off, no haul-away, no lift, ZIP 22401: the job works out at $880, under the $3,500 minimum, and quotes at $3,500 – $3,850. Note the low end of the band is the floor itself, not 10% below it. The heavier board floors at $4,800: the same gable in cedar quotes $4,800 – $5,376.
  • Over the ceiling. Enter 3600 square feet, insulated vinyl, three stories, 40 openings, 320 feet of soffit, two layers coming off, hauled away, known water damage, complicated cuts. The midpoint works out at $50,346, clearing the service’s $32,000 ceiling, so the widget routes to “we’ll come and measure” rather than printing a number. The heavier board has its own ceiling at $45,000, which a 3,200-foot three-story in site-stained cedar clears at $83,515.
  • Routing mode. Pick Stucco, stone, storm damage and asbestos shingle. That service is in site-visit mode, so it never shows a price at all; the visitor sees “we like to see it first”. None of its questions carries a pricing rule, which the widget still validates and still records.
  • The one place a help string is doing a rule’s job. Asbestos-cement shingle siding is on plenty of pre-1980 houses in this market and it is an abatement job, not a siding job — but no rule kind lets one dropdown answer route the visitor to another service. So the tear-off question’s help text says in capitals to stop and pick the site visit instead, and that service’s first question lists it. A sentence is a weaker guard than a rule would be, and it is worth knowing that is what is holding it.
  • The photo question carries no rule. Photos never move the price — the engine skips them entirely. Nothing is uploaded either: on a demo the visitor can tick “I have photos I can send” and the lead records “Has photos to send, not uploaded”, which is the owner’s cue to ask for pictures on the call. Attaching the image itself is on the roadmap.
  • No season on this account, and that is a decision. Vinyl and insulated vinyl siding and Fiber cement, engineered wood and cedar both carry no seasonal adjustment, so every figure above is the same figure in any month and the commands need no --date. Three fixtures in the estate — roofing, decks and painting — do carry a December-to-February winter discount, and the commercial logic is true here too: the schedule empties in January. It is declined because siding is the one exterior trade here where the off-season has a physical objection and not only a commercial one. Vinyl goes brittle and splits at the nail hem below about 40 degrees, and the caulk and site-applied paint on fiber cement will not cure below 50. A published winter discount would be advertising a price for work the crew should be talking the customer out of.
  • The missed-call text-back. The CallMitt page replays which of five messages a missed caller would get and why. Straight about where it stands: the texting number is not live and no registration is filed yet, and the forwarded-call hook waits on that number, so today the missed call is logged by hand and the reply becomes an outbox row marked queued. It is not delivered, and a queued row that is still sitting there an hour later is retired rather than sent. The rules, the hours, the weekend, holiday and vacation branches, the quiet hours and the opt-out handling are all built and running now.
  • The widget’s navy matches this site because the account’s key carries a theme color; the same script on an agency’s client site would carry the agency’s color.