Whole-house repipes
Every supply line from the meter to the last fixture, in PEX or copper, pressure-tested before the walls close. The job most houses here need once the galvanized starts closing up.
Tell us what the job is, how many bathrooms the new pipe has to reach and how we get at it. You get a real price range in about a minute. Then we open one section, look at what is actually up there, and confirm it in writing.
Not ready for a price?
Permit, inspection and a pressure test before anything is closed up are in every repipe and main line we quote. We do not leave a wall open or a valve you cannot reach.
Every supply line from the meter to the last fixture, in PEX or copper, pressure-tested before the walls close. The job most houses here need once the galvanized starts closing up.
Grey plastic pipe with crimped rings, put in between about 1978 and 1995. It cannot be patched and carriers will not write around it, so the whole system goes.
A tank swap on the day, or a tankless with the gas line and the venting sized properly rather than squeezed onto what is already there.
The run from the meter to the house, when the pressure has gone or the meter turns with everything off. Dug or pulled, and the yard put back.
A slow drain, no hot water, a leak under a sink, water coming through a ceiling. One trip charge however many fixtures we look at.
A sewer out to the street, a well pump and pressure tank, a building still in use. We camera the line or test the system before we quote.
The form at the top of this page uses our real rates. It shows a range rather than a single number because what is behind the plaster, how the old pipe was run and what the shutoffs are actually doing are things we can only see with a section open.
What we are doing, how many bathrooms it has to reach, what we are running it in, how we get at it, whether the house is on polybutylene, and whether you want the drywall put back. The same questions we ask on the phone.
Midpoint plus or minus 9%. Jobs under our $1,750 minimum quote at the minimum, and polybutylene supply raises that floor to $6,400. Very large jobs get a site visit instead of a number.
Free assessment, exact price, written warranty. Travel is priced from your ZIP. The price does not change with the month — pipe that has closed up in January has closed up in July.
Your ZIP code sets the travel line on your estimate. No surprises on the invoice, and no free hour on I-95 that gets built into everyone else’s price.
2 bathrooms, PEX, a finished basement ceiling, polybutylene No, drywall patched Yes, next opening. Use ZIP 22191. The live pricing engine returns $6,925 – $8,295 with the disclaimer, and the lead lands in the demo account’s inbox. The $4,200 repipe step, two bathrooms at $690, the $780 finished-ceiling access and the $1,250 to patch and paint make $7,610, and no answer on that path carries a percentage.0 bathrooms fires no rule at all — not the multiply, not a percent — so a water heater going in on its own comes back at $1,750 – $2,017 rather than carrying a bathroom’s worth of money. Leave the drywall to somebody else and the priced path is $5,788 – $6,932.qf_price() takes five arguments and not one of them is an hour, so a 2am premium cannot be expressed at all. What you see above is urgency the customer declares on a dropdown, which is a different and honest thing. It is a percentage rather than a fee on purpose: a flat is added in step 1 and is then multiplied by every percentage after it, so a “$185 after-hours fee” would stop being $185 the moment anything else on the form carried a percent.20110 (Manassas) or 22401 (Fredericksburg) for the outer-ring fee: $6,984 – $8,366. Any ZIP outside the listed prefixes, whether 22201 (Arlington) or 20852 (Rockville, MD), falls to the catch-all zone: $7,316 – $8,763, the percentage first and then the flat fee.99901. The visitor gets a polite decline instead of a price, and the lead is still captured.6 bathrooms in copper and it still prices, at $11,890 – $14,242. Ask for a seventh and the midpoint clears the service’s $13,750 ceiling, so the widget routes to “we’ll come and look” rather than printing a number. Because routing is tested on the midpoint and the band is drawn afterwards, that ceiling sits below $15,000 on purpose: the highest number this service can ever print is $14,988, and the highest any real answer set reaches is $14,966.0 bathrooms to reach, PEX, an open crawlspace, nothing else, ZIP 22191: the work itself is $1,600, under the $1,750 minimum, and it quotes at $1,750 – $1,908. Note the low end of the band is the floor itself, not 9% below it.1 fixture, ground floor, a working shutoff, no replacement, next opening. $228 – $290, and the $129 trip and diagnostic is inside that number rather than added at the door — it is the service’s base fee, so it is added once however many fixtures we look at. A second drain on the same visit is labour only: $268 – $340. Answer “no working shutoff” and the rule fires on the No side for $145: $356 – $452. Water through a ceiling, two fixtures, behind a finished wall, no shutoff, today comes back $801 – $1,019. That service has its own $1,500 ceiling, and eight fixtures behind a finished ceiling with a replacement and same-day service routes rather than pricing.--date=2027-02-11 and again with --date=2027-07-14 and both return $6,925 – $8,295.